Emaar Dubai Mall Traffic Signals Maintenance

TraffeXcel was awarded 3 years Traffic Signal Maintenance contract with at the most iconic location in Dubai at Emaar Downtown Master Community (Dubai Mall).

Our main scope is to provide both preventative and reactive maintenance of the TR2500 compliant traffic controller Traffic lights and other ITS equipment at all 14 junctions in the community.

Our objective is to guarantee the optimum performance of the installed system. It includes preventive maintenance and Corrective maintenance along with the periodic meeting with the clients to enhance the system operations.

You can download the project sheet below:

Project-Sheets_Emaar Dubai Mall Traffic Signals